The Order of Prometheon
Prometheon Hardware · Order IV

Sovereign AI compute, on home soil.

Portable, modular AI data centres — GPU-ready, liquid-cooled and running in about twenty-two weeks, not two years. Built so a nation’s most sensitive AI workloads stay inside its borders and under its own law.

Flagship configuration · Indicative
22 weeks
Order to operational
576
NVIDIA GB300 GPUs
2.5 MW
Total power capacity
PUE 1.05
Direct liquid cooling
8 → 1,152
GPUs across the range
Infrastructure & Hardware · The physical layer

The physical layer of sovereign AI.

Compute, modular data centres, semiconductors and strategic infrastructure. Prometheon develops, integrates and partners across AI infrastructure.

Compute

GPU infrastructure, private and on-premises AI, sovereign compute.

Modular data centres

From edge to multi-megawatt, for national and enterprise infrastructure.

Semiconductors

A future strategic focus, through ecosystem partnerships.

Strategic infrastructure

Relationships capable of supporting modular sovereign-compute deployments.

  1. Infrastructure
  2. Intelligence
  3. Applications
  4. Products
  5. Customers
  6. Recurring revenue

Portable data centres · How it is built

A data centre that arrives.

Factory-built modules for compute, cooling, storage, power and network — integrated and tested before they ship, then joined on site into a single machine.

  1. I

    Compute

    • 8 × NVL72 racks, 576 NVIDIA GB300 GPUs
    • Rack-scale NVLink fabric
    • About 1.2 MW of compute load
  2. II

    Cooling

    • Direct liquid cooling to every GPU
    • Closed glycol and water loop
    • N+1 redundant pumps
  3. III

    Storage

    • NVMe all-flash, petabyte scale
    • GPU-direct data paths
    • Fast checkpointing for long training runs
  4. IV

    Power & network

    • 2.5 MW dedicated feed with UPS backup
    • 800 Gb/s InfiniBand and Ethernet
    • Clean-agent fire suppression

Capacity in steps. Add modules as demand grows, instead of committing to a whole building on day one.

Ready for the next generation. Designed around NVIDIA GB300 today, and Vera Rubin as it arrives.


The range · From one rack to a campus

Infrastructure, built in modules.

The same architecture at every size, so a ministry can start with one rack and grow to a national campus without starting again.

SystemGPUsBuilt for
Managed rack8An enterprise or ministry starting out
Regional cell32Regional inference, or a four-node private AI cloud
Rack-scale module72One NVLink domain — also in a high-assurance sovereign build
AI factory576A nation’s sovereign AI compute
Campus block864A campus that grows block by block
Next generation1,152Reference architecture · design target

For people and teams · From a laptop to a lab

Sovereign AI, on the desk.

Not every model needs a data centre. Personal and departmental systems keep sensitive work on hardware you hold.

  1. I

    AI laptops

    • 48 to 128 GB of unified memory
    • 14 to 16-inch, memory-rich
    • A sovereign build for sensitive work
  2. II

    Desk systems

    • 1 PFLOP FP4 on a single node
    • 2 PFLOP as a linked pair
    • Local models, no cloud
  3. III

    Team lab

    • 8 PFLOP FP4 across eight nodes
    • Each node scheduled independently
    • A department’s own AI cluster
  4. IV

    Frontier station

    • NVIDIA GB300 at the desk
    • Hundreds of gigabytes of coherent memory
    • Frontier-scale work without a server room

NVIDIA GPUs · By quotation

The silicon itself, sourced.

For clients building their own capacity, we source NVIDIA systems directly — from a single server to a full rack, and the next platform as it ships.

NVIDIA HGX B300

Eight-GPU Blackwell Ultra server node. By inquiry.

NVIDIA GB300 NVL72

Liquid-cooled rack: 72 GPUs in one NVLink domain. By inquiry, subject to allocation.

NVIDIA Vera Rubin

NVIDIA’s next rack-scale platform. By special inquiry.

Request GPU pricing


Why sovereign · Hardware, jurisdiction and data

Compute is a strategic asset, like energy.

  • I

    Jurisdiction

    Data, models and results stay inside the country, under its own data-protection law, with no dependence on a foreign hyperscaler.

  • II

    Security

    Air-gapped partitions for classified work, biometric entry, and encryption at rest and in transit, end to end.

  • III

    Local capability

    Local assembly, training and knowledge transfer, so the people who run the system are the nation’s own.


What it runs · National workloads

One system. A nation’s workloads.

Sovereign language models

Large models trained on a nation’s own languages and data, without relying on foreign platforms.

Defence & security

Signal intelligence and data fusion on air-gapped partitions, with zero outside exposure.

Healthcare

Population-scale genomics, AI radiology and faster drug discovery.

Climate & agriculture

High-resolution weather simulation, crop-yield prediction and resource planning.

Public services

Identity verification, compliance auditing and case analytics for accountable government.

Research & education

Supercomputing for universities and laboratories, and a home for national talent.


Rapid execution · Indicative timeline

From order to live in twenty-two weeks.

A factory-built approach with engineering in parallel — against 18 to 24 months for a conventional data-centre build.

  1. Weeks 1–2

    Order

    Commercial terms, technical validation, approvals.

  2. Weeks 3–14

    Build

    Site preparation and module manufacturing, in parallel.

  3. Weeks 12–17

    Ship

    Logistics, customs and secure transport to site.

  4. Weeks 17–21

    Install

    Placement, interconnect, power, cooling and network.

  5. Week 22

    Go live

    Benchmarking, security hardening, handover and training.


Shown, not told · Real metal, live

The metal, shown.

The silicon that thinks and the hall that keeps it running, rendered live. Turn them with your hand.

The die — compute, sealed in gold
The hall — where the fire is kept burning

Specification · Flagship configuration

The system, in numbers.

ConfigurationFactory-built modules for compute, cooling, storage, power and network, operated as one system
GPUs576 × NVIDIA GB300 (Blackwell Ultra)
Compute racks8 × NVL72
Network fabricInfiniBand and Ethernet, 800 Gb/s
StorageNVMe all-flash, petabyte scale, GPU-direct
Power2.5 MW total · 3-phase 415 V · N+1 lithium-ion UPS
CoolingDirect liquid cooling · PUE 1.05–1.08
SecurityAir-gapped partitions · biometric access · encryption at rest and in transit
Time to operationalAbout 22 weeks from order

Indicative. Final configuration, timeline and pricing depend on site readiness, approvals and technical scope. Available to purchase or as a funded lease.

Begin · Purchase or funded lease

Own your nation’s compute.

Request a configuration →

First world — Prometheon Government →